Showing posts with label Schedule. Show all posts
Showing posts with label Schedule. Show all posts

Tuesday, 3 March 2015

Member Change

Changing the band members:


We have had to change the members of the band due to the lead singer not being able to make all of the deadlines for the shooting arrangements. This means that we had to change the band and add someone else into the band to cover for the lead singer. This also meant that we have had to change our already shot pieces of work, and we have to reshoot.

We have a couple of options, one of the options is to have our friend Terry be the guitarist of the band and delete all of our already shot guitar pieces with our original guitarist,Max, or we have the option to replace the lead singer with me or Terry, making the guitar shots completely acceptable to keep.We have decided to use Terry as the lead singer 




Guitar:Max



Lead Singer:Terry

Drums:Shaun


Sunday, 2 November 2014

What is completed

Within this post i am going to be talking about all the things which i have completed and need to complete in the the first part of my media coursework.I need to create a list of the things which i have completed and things which i need to do.This will help with creating and catching up with my work.

What I have completed:

  • Brief                                                                                                                                                                                                                                                                                                                                                                                                             
  • Goodwins class notes
  • History of the music video
  • Post Modernism
  • Audience Profile (needs additional work)
  • Fonts
  • Planning
  • Record Labels: Major VS Minor
  • Music video analysis (Same genre)
  • Production Log
  • Possible ideas for bands appereance
  • Digi-pak verbal analysis